section 321216 bituminous concrete pavement part

SECTION 321216 BITUMINOUS CONCRETE PAVEMENT PART 1

BITUMINOUS CONCRETE PAVEMENT 321216 - 1 SECTION 321216 BITUMINOUS CONCRETE PAVEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 WORK INCLUDED A.

get price

SECTION 321216 - ASPHALT PAVING

Asphalt concrete surfacing shall conform to Section 39 of the CALTRANS Standard Specifications. Paving shall be done under suitable weather conditions for such operations. Temperatures shall be above 50 deg F (10 deg C) during placement of paving, and shall be above 40 deg F (4.4 deg C) during placement of asphalt treated permeable base.

get price

SECTION 321216 – bituminous pavement

SECTION 321216 – bituminous pavement. GENERAL. RELATED DOCUMENTS. ... The core holes shall be filled with hot mixture and thoroughly compacted as part of the coring operation. The method of filling holes and obtaining compaction shall be agreed upon prior to production. Pavement density acceptance testing will be completed within 1 work day ...

get price

321216 - ASPHALT PAVING

SECTION 321216 - ASPHALT PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Cold milling of existing asphalt pavement. 2. Hot-mix asphalt patching. 3. Hot-mix asphalt paving. 4. Hot-mix asphalt overlay. 5. Asphalt curbs. B. Related Requirements: 1. Section 312000 "Earth Moving" for subgrade preparation, fill material, unbound-

get price

SECTION 321216 - ASPHALT PAVING

SECTION 321216 - ASPHALT PAVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS ... B. Portland Cement Concrete Pavement: Break cracked slabs and roll as required to reseat concrete pieces firmly. 1. Pump hot undersealing asphalt under rocking slabs until slab is stabilized or, if necessary, crack slab ...

get price

C. Related Work Specified Elsewhere

ASPHALT PAVING 321216 - 1 . SECTION 321216 - ASPHALT PAVING . PART 1 - GENERAL . 1.1 DESCRIPTION . A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. B. Work Specified in this Section: 1. Subgrade preparation.. 2. Soil sterilization. 3.

get price

Section 321216 - ASPHALT PAVING

Apr 04, 2014  ASPHALT PAVING 321216 - 1 SECTION 321216 - ASPHALT PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section 1.2 SUMMARY A. Section Includes: 1. Asphalt materials. 2. Aggregate materials. 3.

get price

32 12 16 - ASPHALT PAVING

SECTION 32 12 16 ASPHALT PAVING PART 1 - GENERAL 1.01 SECTION INCLUDES A. Placing of base course. B. Placing of asphalt concrete. C. Sealant. D. Field quality control. E. Maintenance of pavement. 1.02 RELATED SECTIONS A. Preparation of sub grade to proper grade for base course, including compaction, is specified in Section 31 00 00 - Earthwork.

get price

C. Related Work Specified Elsewhere

ASPHALT PAVING 321216 - 1 . SECTION 321216 - ASPHALT PAVING . PART 1 - GENERAL . 1.1 DESCRIPTION . A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. B. Work Specified in this Section: 1. Subgrade preparation.. 2. Soil sterilization. 3.

get price

SECTION 321216 - ASPHALT PAVING

SECTION 321216 - ASPHALT PAVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Cold milling of existing hot-mix asphalt pavement. 2. Hot-mix asphalt ...

get price

SECTION 32 12 16, ASPHALT PAVING - Veterans Affairs

The hot asphalt concrete pavement shall consist of an aggregate or asphalt base course and asphalt surface course constructed in conformity with the lines, grades, thickness, and cross sections as shown. Each course shall be constructed to the depth, section, or elevation required by the drawings and shall be rolled, finished, and approved ...

get price

ASPHALTIC CONCRETE PAVING SECTION 321216-1

ASPHALTIC CONCRETE PAVING SECTION 321216-1 ... MARCH 10, 2021 PART 1 - GENERAL All applicable portions of Division 1, including the drawings and general provisions of the contract, the ... other structures projecting into or abutting asphalt concrete pavement. 3.1.3.4 Allow surfaces to dry until material is at condition of tackiness to receive

get price

ASPHALT PAVING PART 1 - GENERAL

ASPHALT PAVING Page 321216- 3 C. Joint Sealant: ASTM D 6690, Type I, hot-applied, single-component, polymer-modified bituminous sealant. 2.4 MIXES A. Hot-Mix Asphalt: Dense-graded, hot-laid, hot-mix asphalt plant mixes designed according to procedures in AI MS-2, "Mix Design Methods for Asphalt Concrete and Other Hot-Mix Types";

get price

SECTION 010000 - DPR SPEC TEMPLATE

Division 32 Section “Concrete Walks, Curbs and Miscellaneous Flatwork”. Division 32 Section “Pavement Markings”. REFERENCES. Plant mix pavements for this project shall be done in accordance the Metropolitan Government Pavement Engineers Council (MGPEC) Specification Item 20 for Hot Mix Asphalt Pavement (HMA) and Stone Matrix Asphalt (SMA).

get price

Copyright 2009 CITY OF JACKSONVILLE NSP-TECHNICAL ...

ASPHALT PAVING 321216 - 2 PART 3 - EXECUTION . 3.1 PAVING A. Tack coat existing asphalt or concrete surfaces and allow tack coat to cure undisturbed. B. P. lace hot-mix asphalt to required grade, cross section, and thickness. Promptly correct surface irregularities in paving course. 1. Spread mix at minimum temperature of 250 deg F. C.

get price

DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ...

Printed 01/21/2021 321216 - 1 Project No. 45649 -C SECTION 321216 ASPHALT PAVING PART 1 GENERAL 1.01 REFERENCES A. New York State Department of Transportation (DOT) Specification section 400 dated January 1, 2020. 1.02 RELATED WORK SPECIFIED ELSEWHERE A. Earthwork: Section 310000. B. Pavement Marking: Section 321723. 1.03 SUBMITTALS

get price

Northwest Elementary School PDE-3835 SECTION 321215 ...

SECTION 321215 - UNBOUND PAVEMENT BASE COURSES PART 1 - GENERAL ... (Bituminous) 95% of maximum dry density ASTM D1557, Modified Proctor Rigid (Concrete) 95% of maximum dry density ASTM D1557, Modified ... Place aggregate as indicated on pavement section details. B. Level and contour surface to form level and constant gradient.

get price

University of Houston Master Construction Specifications ...

AE Project Number: Asphalt Concrete Paving 32 12 16 – 1 Revision Date: 1/29/2016 . SECTION 32 12 16 ASPHALT CONCRETE PAVING . PART 1 - GENERAL . 1.1 SCOPE OF WORK . A. This Section specifies the requirements for placing a hot laid plant mix asphalt surface course

get price

SECTION 321373 - CONCRETE PAVING JOINT SEALANTS

Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Expansion and contraction joints within cement concrete pavement. 2. Joints between cement concrete and asphalt pavement. B. Related Sections include the following: 1. Section 321216 – Asphalt Paving 2. Section 321313 – Concrete ...

get price

PROJECT MANUAL REPAVE PARKING LOT HARTFORD

Section 321216 Section 321619 Section 321723 Section 329101 Section 329200 Asphalt Paving 84 ... notes or "Specification Modifications" issued as part of individual contract documents. ... Milling/removal of existing bituminous concrete pavement and curbs. 2. Limited subbase replacement in an area of the parking lot.

get price

PROJECT: Hanover Grove Cooperative Splash Pad

SECTION 321216 – ASPHALT PAVING . PART 1 - GENERAL . 1.1 SUMMARY . A. Section Includes 1. Asphaltic concrete binder, bituminous material / HMA and surface course. 2. Milling of existing pavement. B. Related Sections 1. Section 31 20 00 - Earthmoving 2. Section 32 11 23 - Aggregate Base Course 3. Section 32 10 00 - Concrete Sidewalks

get price

32 12 16 - ASPHALT PAVING

SECTION 32 12 16 ASPHALT PAVING PART 1 - GENERAL 1.01 SECTION INCLUDES A. Placing of base course. B. Placing of asphalt concrete. C. Sealant. D. Field quality control. E. Maintenance of pavement. 1.02 RELATED SECTIONS A. Preparation of sub grade to proper grade for base course, including compaction, is specified in Section 31 00 00 - Earthwork.

get price

SECTION 321216 - ASPHALT PAVING

SECTION 32 12 16 ASPHALT PAVING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. B. 01 60 00 - Product Requirements 1.02 SUMMARY A. Section Includes: 1.

get price

University of Houston Master Construction Specifications ...

AE Project Number: Asphalt Concrete Paving 32 12 16 – 1 Revision Date: 1/29/2016 . SECTION 32 12 16 ASPHALT CONCRETE PAVING . PART 1 - GENERAL . 1.1 SCOPE OF WORK . A. This Section specifies the requirements for placing a hot laid plant mix asphalt surface course

get price

SECTION 010000 - DPR SPEC TEMPLATE

Division 32 Section “Concrete Walks, Curbs and Miscellaneous Flatwork”. Division 32 Section “Pavement Markings”. REFERENCES. Plant mix pavements for this project shall be done in accordance the Metropolitan Government Pavement Engineers Council (MGPEC) Specification Item 20 for Hot Mix Asphalt Pavement (HMA) and Stone Matrix Asphalt (SMA).

get price

Copyright 2009 CITY OF JACKSONVILLE NSP-TECHNICAL ...

ASPHALT PAVING 321216 - 2 PART 3 - EXECUTION . 3.1 PAVING A. Tack coat existing asphalt or concrete surfaces and allow tack coat to cure undisturbed. B. P. lace hot-mix asphalt to required grade, cross section, and thickness. Promptly correct surface irregularities in paving course. 1. Spread mix at minimum temperature of 250 deg F. C.

get price

Table of Contents

SECTION 321216 - ASPHALT PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Hot-mix asphalt paving parking areas. 2. Hot-mix asphalt paving of greenway trail. B. Related Requirements: 1. Section 312000 "Earth Moving" for subgrade preparation, fill material, separation

get price

PROJECT: Hanover Grove Cooperative Splash Pad

SECTION 321216 – ASPHALT PAVING . PART 1 - GENERAL . 1.1 SUMMARY . A. Section Includes 1. Asphaltic concrete binder, bituminous material / HMA and surface course. 2. Milling of existing pavement. B. Related Sections 1. Section 31 20 00 - Earthmoving 2. Section 32 11 23 - Aggregate Base Course 3. Section 32 10 00 - Concrete Sidewalks

get price

PROJECT MANUAL REPAVE PARKING LOT HARTFORD

Section 321216 Section 321619 Section 321723 Section 329101 Section 329200 Asphalt Paving 84 ... notes or "Specification Modifications" issued as part of individual contract documents. ... Milling/removal of existing bituminous concrete pavement and curbs. 2. Limited subbase replacement in an area of the parking lot.

get price

VOLUME 2 SPECIFICATION DIVISIONS 22-32 - Connecticut

Section 321216 Bituminous Concrete Pavement 2 Section 321623 Curbing 6 Section 321723 Pavement Markings 9 Section 323113 Chain Link Fences and Gates 13 Section 323300 Bollards 3 ... PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

get price

Northwest Elementary School PDE-3835 SECTION 321215 ...

SECTION 321215 - UNBOUND PAVEMENT BASE COURSES PART 1 - GENERAL ... (Bituminous) 95% of maximum dry density ASTM D1557, Modified Proctor Rigid (Concrete) 95% of maximum dry density ASTM D1557, Modified ... Place aggregate as indicated on pavement section details. B. Level and contour surface to form level and constant gradient.

get price

SECTION 044300 - STONE MASONRY

CITYWAY ASPHALT PAVING Site Development Package Section 32 12 16 - 1 CONTEXT #2011-556 CONTEXT, LLC ASPHALT PAVING 32 12 16 - 1 SECTION 321216 – ASPHALT PAVING . 1. PART 1 - GENERAL . 1.1 RELATED DOCUMENTS AND WORK . A. Drawings and general provisions of the Contract, including General and

get price

321373 - PAVING JOINT SEALANTS -

A. Section Includes: 1. Cold-applied joint sealants. 2. Hot-applied joint sealants. B. Related Sections: 1. Section 321216 "Asphalt Paving" for constructing joints between concrete and asphalt pavement. 2. Section 321313 "Concrete Paving" for constructing joints in concrete pavement. 1.3 PRECONSTRUCTION TESTING

get price

ADDENDUM NO. 1 - City of San Carlos

Technical Specifications SECTION 321216 – ASPHALT PAVING AND MISCELLANEOUS PAVING ITEMS; PART 1 GENERAL; 1.6 ENGINEER’S ACCEPTANCE; Add sub-section H with the following: “H. Asphalt concrete (HMA) shall be compacted to a relative compaction of 95 percent.” 5. Technical Specifications SECTION 321216 – ASPHALT PAVING AND

get price

SECTION 02400 - palmbeachschools

SECTION 32 12 16. ASHPHALT PAVING. PART 1GENERAL. SECTION INCLUDES. The intent of this specification section is to provide requirements for materials, equipment, and methods for constructing new pavements. Paving work includes. Preparation and compaction of soil sub-grade to proper elevations below the lime rock or recycled crushed concrete base.

get price